Managing Change Orders Wisely

Illustrative stock photo: A tradesperson in blue overalls standing in a small grey-tiled bathroom, working on exposed plumbing behind an open wall panel. A blue-and-black toolbox sits on the closed toilet; a sink, mirror, soap dispenser, and a wall-mounted light are visible.; not a Craftsworth Construction project

Illustrative stock photo—not a Craftsworth Construction project. Photo by bhagya laxmi on Unsplash.

Why change orders happen (and why theyre not always bad)

Hi, I'm Matt Morton. After 25+ years in the trades and running Craftsworth Construction since February 2017, I still see homeowners surprised when change orders show up mid-project. A change order is simply a written amendment to your original contract that adjusts price, scope, or schedule. Theyre how we handle the unexpected details that come up once walls are opened or when you choose upgrades after work has started.

Common causes of change orders

  • Hidden conditions in older Chester or Delaware County homes like plaster over lath, knob and tube wiring, or unexpected rot
  • Late design or material decisions—selecting different tile, countertops, or plumbing fixtures after demolition
  • Permit-based requirements discovered during inspections
  • Supply chain or lead-time issues forcing substitutions
  • Client-directed upgrades requested while construction is underway

How to minimize surprises before they become change orders

Prevention is the easiest way to limit change orders. Here are practical steps to take before demolition or signing a final contract.

  1. Do a thorough pre-demo inspection. Ask your contractor to inspect for visible and likely hidden issues. In Chester County older homes, expect unexpected framing, plumbing, or electrical that adds work.
  2. Make selections early. Pick your cabinets, counters, tile and fixtures before work begins. Lead times for some finishes can be several weeks — late choices often cause schedule changes and costs.
  3. Build a contingency into your budget. Projects often include unknowns; a common contingency is 10 to 20 percent depending on the scope and home age. Treat it as a buffer, not spare cash.
  4. Clarify allowances. If the contract uses allowances for finishes, make sure theyre realistic. Low allowances can look great on paper and force change orders when actual items cost more.
  5. Understand permit implications. Some townships in Chester and Delaware counties have specific code triggers. Ask your contractor about likely permit-based changes early.

What to require when a change order is proposed

If an unexpected condition or request comes up, insist on formal documentation. A good change order should include:

  • Clear description of the added or removed work
  • Itemized cost breakdown: labor, materials, permits, and subcontractor fees
  • Net change to the contract sum and how it affects the payment schedule
  • Updated timeline with realistic start and finish dates for the changed scope
  • Signature lines for both homeowner and contractor and a date

Practical negotiation points

When presented with a change order, you have options. Ask for alternatives, request a credit if you are removing work elsewhere, or ask for staged approvals so you can defer nonessential upgrades. If a supplier's substitution is suggested because of a delay, ask for a sample or written spec and a credit if you later choose the original item.

How Craftsworth approaches change orders

At Craftsworth Construction we try to prevent surprises with a detailed scope and early selections. When change orders are unavoidable, I make sure theyre in writing, clearly priced, and explained face to face or over the phone. Transparency matters. Our owner-confirmed Google snapshot on 2026-11-14 shows a 4.9-star rating from 37 Google reviews — that feedback often references clear communication during the unexpected moments of a remodel.

Managing costs and timeline impacts

Change orders affect both budget and schedule. Here are actionable ways to keep those impacts reasonable:

  • Prioritize changes. Decide which changes are must-haves and which can wait for a future phase.
  • Use contingency funds first for unforeseen site conditions. Track contingency spend separately from client-requested upgrades.
  • Request a new completion date with the change order and set expectations for how it affects trades schedules.
  • Consider partial approvals: accept the change in scope but delay ordering long-lead items until youre sure.

Keeping a project log

Keep a running log of every change order, approved email, and vendor quote. This protects you and the contractor if there are later disagreements. A simple spreadsheet that lists the change order number, date, description, cost, who approved it, and the expected time impact is invaluable.

Red flags to watch for

  • Verbal promises that arent followed by written change orders
  • Vague descriptions or lump-sum increases without itemization
  • Pressure to approve hurriedly without time to review
  • Repeated small change orders that add up to a large increase; ask to bundle and re-price

My advice: treat change orders as part of the remodeling process, not a personal failure. With clear documentation and communication you can control cost and schedule impacts.

Local tips for Chester and Delaware County homeowners

In our area, older construction and municipal permit nuances are the most common origins of change orders. If you have a historic home or a stone foundation, budget a little extra time. Also, remember that seasonal work windows in winter can magnify the schedule impact of a change order, so try to finalize scope before cold-weather months.

Final checklist before you sign

  1. Confirm allowances and finalize major selections
  2. Ask about likely hidden conditions and how they will be handled
  3. Agree on a contingency amount and when it will be used
  4. Require that all changes be documented, signed, and dated
  5. Keep communication lines open with your project manager

If youd like to talk through how change orders are handled on a project in Chester or Delaware County, give us a call. I try to meet homeowners where theyre at, explain potential unknowns up front, and keep paperwork clear so remodels stay on track. Craftsworth Construction has completed 427+ lifetime projects and we operate Monday through Saturday 8 AM to 5 PM and Sunday 10 AM to 3 PM.

Thanks for reading. If you have a specific concern about a pending change order, send the details and I can walk you through what to expect and how to respond.